Apartment Refurbishments – Gardiner Place, Dublin
Background
- 5 storey Georgian building located just 5 mins walk from Dublin City Centre.
- Building contained 10 bedsits.
- Building needed to be totally refurbished as was in derelict state.
- Plant problem forming a large crack on boundary and needed attention.
The Challenge
- Convert 10 bed sits to 4 no 1 bedroom and 1 no 2 bedroom apartments
- Improving living standards.
- Maximise rental income and enhance value of asset.
- Improve tenant mix.
- Back yard needed some improvements.
Building Matters Solutions
- Provided a working solution for safe removal of plants from boundary.
- Propose a cost effective heating system.
- Integrated the use of secondary glazing on the front of building to reduce costs compared to total window replacement.
- Up grading of hot water controls.
- New kitchens in all apartments.
- Installation of new floors.
- Painting and decorating throughout.
- Proposed a paved backyard and timber wall cladding so to reduce maintenance.
Results Achieved
- Improved comfort standards with new heating upgrade.
- Reduced electricity bills.
- 50% increase in rental revenue from previous rents.
- Increased numbers of professionals as tenants.
Background
- 5 storey Georgian building located just 5 mins walk from Dublin City Centre.
- Building contained 10 bedsits.
- Building needed to be totally refurbished as was in derelict state.
- Plant problem forming a large crack on boundary and needed attention.
The Challenge
- Convert 10 bed sits to 4 no 1 bedroom and 1 no 2 bedroom apartments
- Improving living standards.
- Maximise rental income and enhance value of asset.
- Improve tenant mix.
- Back yard needed some improvements.
Building Matters Solutions
- Provided a working solution for safe removal of plants from boundary.
- Propose a cost effective heating system.
- Integrated the use of secondary glazing on the front of building to reduce costs compared to total window replacement.
- Up grading of hot water controls.
- New kitchens in all apartments.
- Installation of new floors.
- Painting and decorating throughout.
- Proposed a paved backyard and timber wall cladding so to reduce maintenance.
Results Achieved
- Improved comfort standards with new heating upgrade.
- Reduced electricity bills.
- 50% increase in rental revenue from previous rents.
- Increased numbers of professionals as tenants.